May 09, 2024

0.5 - 0.6mm Stainless Steel Round Pipe Downspout Roll Forming Machines

Model NO.: SH-RP
Trademark: Suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
0.5 - 0.6mm Stainless Steel Round Pipe Downspout Roll Forming Machines
 
Round Pipe Technical Parameter 
 
1.   Steel Sheet Thickness: 0.5-0.6mm (depend on requirement )
2.   Voltage: 380V, 50HZ, 3 phase
3.   Transmission way: single chain
4.   Material of blad: Cr12, quenching treatment
5.   Capacity of Decoiler: 3 ton passive decoiler
6.   Forming Speed: 12m/min
7.   Roller Groups: about 24 stations 
8.   Roller Material: 45# grade steel, quenching treatment
9.   Roller Diameter: 180mm
10. Principal Axis: 45# high grade steel with quenching treatment
11. Main Motor Power: 11 Kw
 
 Round Pipe Main Components
 
 1. 3 ton passive decoiler--------------------------------- 1Set
2. Main roll forming machine----------------------------  1Set
3. Fly saw cutting-------------------------------------------  1Set
4. Cooling system------------------------------------------  1Set
5. Finished products tabel--------------------------------- 2Set
6. PLC control system-------------------------------------- 1Set
7. Straighten device----------------------------------------- 1Set
8. Feeding guiding------------------------------------------- 1Set
9. Levelling device-------------------------------------------  1Set
 
 
 Advantage for Round Pipe
 
 1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
 
 
 Working Flow of Round Pipe
 
Decoiler ---- Feeding --- Levelling --- Cutting --- Roll forming --- Fly saw cutting --- Run out table



Company Introduction
 
  Wuxi Suhang Machinery manufacturing Co., Ltd. is a comprehensive enterprise integrating production, sales and services. We are mainly engaged in providing machineries and equipment. Owing to a professional teamwork, we are experienced in manufacturing, import and export, customers' design, installation and test, technical solution and after-sale services. We have shipped out our machines to more than 50 countries, and keep good business relationships with a large amount of worthy customers, contributing to our great business records and reputation.

C TRANSPORTATION
All goods will be shipped to your country, containers number will be decided with how many machines you would choose
D. Installation of the machine
    The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
-   Installation by Suhang service technicians.
    -   The following services are included:
    -   Installation of the machine components.
    -   Adjustment of the machine components.
    -   Connection of all motors to the control cabinet.
    -   Installation of the required safety devices.
    Delivery extent does not comprise of:
    -  Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
    -  Raw material,process material and fuels
    -  Raw material for test blocks
    -  Transport and lifting devices
-  Auxiliary staff.
    The operators of the plant should be present during the installation in order to become familiar with the new machines.
E. Commissioning of the machine
    The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
    The commissioning comprises:
    -  Commissioning by Suhang service technicians
    -  Training at the machine
    -  The following services are rendered
    -  Run up of the machine components
    -  Testing of all functions of the machine components
    -  Start of a fully automatic molding process
    -  Execution of machine acceptance
    Delivery extent does not comprise of:
    -  Raw materials, process materials and consumables
    -  Raw material for test blocks
    -  Transport and lifting devices
    The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
F. Our After-Sales Service Commitments
    Suhang hereby solemnly promises: We implement the "three guarantees" service policy for any equipments sold by Suhang, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer's relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts
The detailed measures are as follows:
 
1. Guidelines for installation and commissioning of equipments:
Based on the actual situation, to assist and guide the Buyer and Buyer's technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;
2. Provide training for operation and maintenance personnel:
Based on the Buyer's request, Suhang will provide free of charge training of the operation and maintenance personnel;
a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;
b) When Suhang is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.
3. If failure occurs in any of the machines during the "three guarantees" period(one year), then, upon the Buyer's request, Suhang will eliminate the failure;
4. Suhang will inform all its Buyers about any upgrades and significant product improvements. Suhang will provide equipment modifications based on their costs. Suhang will provide Buyers with high-quality after-sales services in a careful and responsible attitudes, provide very strong guarantee for the Buyer's normal production.
We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email.
G. Commercial conditions
Quotation:
 
Delivery time:
 
Payment:
 
 
 
Assembly and commissioning:
 
 
Warranty:
 
 FOB Shanghai
 
Approx 60 days after technical clearance and down payment 
 
1. first payment: 40 % by T/T
2. second payment: 60% by T/T, after the successful inspection at seller's workshop, and before delivery
 
One engineer will visit Buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day, The customer should ensure the pre-installation being carried out appropriately.
 
12 months warranty, Starting from the date of the successful installation and commissioning of the equipments.