From the PHFD BC assigned to the fourth floor: The crews did an outstanding job during the structure fire in Wheeling. The Fire Attack Lead-Out from the standpipe utilized all three 75-foot sections of 2-inch hose to reach the fire unit, which is a great example of teamwork and preparedness. It's worth noting that both Wheeling and Prospect Heights use the same 2-inch Denver Load Packs, so the coordination between units was seamless. E39 deserves special recognition for their quick action by applying water from the exterior using a 2.5-inch line before E23 had their 2-inch line in place. This early exterior attack played a crucial role in helping E23 deploy their line safely and efficiently. The pressure at E23’s gauge was recorded at 140 psi, which is a solid reading and shows they were operating within safe limits. Additionally, it was reported that there was significant spalling of the precast concrete ceiling and floor inside the fire unit. This kind of damage highlights the intensity of the fire and the importance of structural integrity assessments during and after incidents. Prospect Heights Fire District photo Prospect Heights Fire District photo Prospect Heights Fire District photo Acoustic Guitar String,Classical Guitar String,Electric Guitar String,Oem Guitar String GUANGZHOU GIDOO MUSICAL INSTRUMENT CO.,LTD , https://www.kaysenguitar.com