Basic methods for the implementation of physical management of permanent building utilization and completed projects

      There are many similarities between mine construction and mine production processes, so mine construction projects can take advantage of production facilities, equipment, power, and even site and living conditions. The construction process utilizes the production conditions that will be formed, which is not only conducive to construction, but also conducive to enterprise construction.
According to the current regulations on the quota of mine construction cost, the source of expenses for the construction party to use permanent construction projects and equipment includes:
1. The work that belongs to the construction preparation project refers to the four-way and one-level project in the preparation stage of the project. The four-way, one-level project and equipment preparation belong to the contractor's work, and may also be entrusted to the contractor, but the expenses shall be borne by the contractor. The contractor can use this part of the permanent works and equipment for free. Before the handover to production, the maintenance costs used by the construction unit and during the escrow period may be included in other construction cost indicators, and the expenses shall be arranged by the construction unit.
2. The contractor shall use the permanent works and equipment within the scope of the drilling and drilling measures. In principle, the contractor shall use the yuan for compensation. During the implementation of the project, the construction unit shall make overall arrangements and provide it to the construction unit for use. Such as winch houses, hoists, wells up and down substations and related facilities, derricks, etc.
3. Projects that fall within the scope of temporary facility fees are generally financed by on-site funds under the project cost. The fee is included in the bid price of the winning bid or the bill of quantities of the engineering quantity. When the contractor uses this part of the permanent project, the contractor shall bear the expenses, and the specific amount and method of payment shall be agreed by the parties in the contract. Such as pressure equipment, drainage facilities, etc.
4. When using permanent compressed air pipeline heating, miner's lamp, charging electric motor vehicle transportation and permanent track and other permanent works and equipment, the contents of the auxiliary workshop service fee shall be paid by the contractor.
5. The equipment of the permanent pressure blower room is included in the machinery fee, and the contractor is responsible for the expenditure.
6. Use permanent construction project maintenance subsidy: Calculated according to 0.5% of the permanent construction cost in the industrial square, arranged and used by the construction unit.

Electrical Heater

Technical information
Heating Material: Carbon crystal
Power: 250W/350W/550W/750W/950W
Voltage: 115V- 220V
Certification: ETL, CE, ROHS, ISO9001, SAA
Frame material: Aluminum frame
Using life: 100, 000 hours
Infrared radiant wavelength: 8~14um
Electric heat radiation conversion rate: >99%F
Surface temperature: 70 - 80 celsius
Installation type: Wall or ceiling mounted
Color: White and colorful (with attractive picture)
Function: Adjustable Thermostat, Overheat Protection

Electric Heater,Electric Winter Air Heater,Electric Water Heater,Electric Infrared Panel Heater

Shandong Dexiang Electrical Technology Co.,Ltd , https://www.infraredroomheater.com